To resolve some issues with the power that cropped up during the last datacenter power system maintenance that resulted in an extended downtime, we're needing to move some power on 3 servers to another circuit so we have redundancy properly set.

These servers will impact some Windows VPS clients, our mail filtering services, Plesk Windows Server, the JodoHost.com website, and a couple behind the scenes storage servers that won't directly impact clients, but may adjust some backup routines.

Each server will need 10-15 minutes and general reboot time.
 
Already here in the datacenter and done the checkup, making sure we are all ready and it is looking good to make the change.
 
Maintenance has already been completed. There was only impact to mail filtering and Plesk Windows servers, everything else was able to stay online fully without reboot required.
 