DATE: December 7, 2007
START TIME: 12:00 AM EST (GMT-5)
ESTIMATED END TIME: 02:00 AM EST (GMT-5)
SERVICES/EQUIPMENT: Core Fiber Connectivity Maintenance
TYPE OF WORK: Upgrade technical capacity of hardware
PURPOSE OF WORK: Improve performance and control
IMPACT OF WORK: Connectivity loss during the maintenance window.
We in association with our fiber uplink provider will be upgrading the capability of the core fiber within our network. This change is being made to allow for better control and performance as our growth continues.We expect a 20 minute period of outage during this window of time from 12AM until 2AM EST.
START TIME: 12:00 AM EST (GMT-5)
ESTIMATED END TIME: 02:00 AM EST (GMT-5)
SERVICES/EQUIPMENT: Core Fiber Connectivity Maintenance
TYPE OF WORK: Upgrade technical capacity of hardware
PURPOSE OF WORK: Improve performance and control
IMPACT OF WORK: Connectivity loss during the maintenance window.
We in association with our fiber uplink provider will be upgrading the capability of the core fiber within our network. This change is being made to allow for better control and performance as our growth continues.We expect a 20 minute period of outage during this window of time from 12AM until 2AM EST.