Following our constant efforts to provide better quality service, we have planned move mail services on the server mail3 to a brand new server. This new server will offer more than thrice the storage capacity when compared to the current server.
This is being done to accommodate current as well as future space needs of our customer mailboxes on this server.
Hardware configuration of the new server:
Intel(R) Xeon(R) CPU E5320 Quad core 1.86Ghz
4GB FBDIMM RAM
SATA-II raid10 Array, available capacity - 457GB
Operating system: CentOS 4.4
The switch to the new mail-server is expected to happen at 2:00:00 AM EDT, on Sunday, April 15.
Possible downtime during the switch is 15 minute or less and no mail will be lost during the process.
Updates will be posted to this thread as and when available.
This is being done to accommodate current as well as future space needs of our customer mailboxes on this server.
Hardware configuration of the new server:
Intel(R) Xeon(R) CPU E5320 Quad core 1.86Ghz
4GB FBDIMM RAM
SATA-II raid10 Array, available capacity - 457GB
Operating system: CentOS 4.4
The switch to the new mail-server is expected to happen at 2:00:00 AM EDT, on Sunday, April 15.
Possible downtime during the switch is 15 minute or less and no mail will be lost during the process.
Updates will be posted to this thread as and when available.