Date of Event: 10/26/2012
Time of Event: 00:00:00 (CDT)
Duration(Mins): 360
Work Planned:
Adjusting MTU Setting for the L2 to L3 Trunks Between the Switches and the Routers in Waco Texas.
While this is scheduled for 6 hours, it will not last that long, there will be a moment or two of brief connectivity loss between 5 and 15 minutes total during the maintenance window.