Hello,
I will be making changes to MSSQL1's power port tonight between 11:45PM EDT and 12:15AM EDT, There is likely to be 15-20minutes of outage during this time as I have to turn off MSSQL1, re-route the power wiring and configure it for a new power port on the remote reboot switches.
This is to resolve an issue with the power being turned off on the switch without being given the command to do so, all efforts will be made to do this as quickly as possible to get the server back running with as little outage as needed.
I will be making changes to MSSQL1's power port tonight between 11:45PM EDT and 12:15AM EDT, There is likely to be 15-20minutes of outage during this time as I have to turn off MSSQL1, re-route the power wiring and configure it for a new power port on the remote reboot switches.
This is to resolve an issue with the power being turned off on the switch without being given the command to do so, all efforts will be made to do this as quickly as possible to get the server back running with as little outage as needed.