CL1 Win-2 Windows 2008 R2 migration at 12:30 PM CDT Sept 06th,2014

Naman Kaushik

Super Moderator
On Sept 6th, at 12:30 PM to 01:30 PM CDT 2014, we will be finalizing the Windows 2003 to 2008 R2 move for Win2 server on Cluster1. With the end of life nearing on windows 2003 there are an increasing amount of attacks and problems coming on 2003 based servers, we are taking this time to move 2003 based servers to 2008 for existing clients.
 
This was completed successfully with a 1 hour delay, the only outage time was the move of IP addresses,which only takes about a minute max.
 
Back
Top