network is up and server working slightly better, we have IDed a few issues making this and will be working to move them off the server as well. There are a few accounts with a lot of domains that really just doesnt get along with the first version of 2008 server.
I've taken the network off for a moment longer, there is something here making it to start consuming everything in a major way, and it gets to a point of uncontrollable making this required to be able to trace the matter.
I am trying to get this to a point of manageable stable, and after that point plan a migration of the server to another node to hopefully help with these issues, but that would be a longer period of time and would like it to be as managed as possible.
Estimated time to complete 1 hour 15 min, there is over 230GB to move with this, and it is moving a little slower than I'd have thought but watched it for a few minutes before giving estimate.